Rehab Scope of Work (SOW) & 4-Stage Construction Draw Schedule Builder
Direct Answer (Rehab Holdback & Draw Underwriting Rule): Institutional Fix & Flip and BRRRR bridge lenders fund up to 85%–90% of as-is purchase price plus 100% of verified rehab costs (capped at 70%–75% of After-Repair Value / ARV), disbursed across 4 inspection draw stages. Structuring on a Non-Dutch drawn-balance shelf (
LD-SHELF-RTL-BRIDGE) charges interest only on disbursed funds rather than the full undrawn rehab reserve, saving borrowers thousands during construction. Arranged by Loan Daddy LLC (NMLS #2827624 · quotes@loandaddy.ai).15-Trade Rehab Holdback
$110,000
Total Cost: $430,000
Total Bridge Loan (LTC / ARV)
$382,000
88.8% LTC · 72.8% ARV LTV
Non-Dutch Interest Saved
+$3,086
Drawn-Balance vs. Dutch Full-Note
90-Day 75% ARV DSCR Takeout
$393,750
Net Payoff Cushion: $11,750
Draw 1: Demo, Framing & Structural
$20,500 (19%)
Draw 2: Roof, Windows & MEP Rough-In
$36,500 (33%)
Draw 3: Drywall, Kitchens, Baths & Floors
$41,500 (38%)
Draw 4: Exterior, Final Punchlist & CO
$11,500 (10%)
15-Trade CSI Division Scope of Work (SOW) & Draw Allocation Table
| CSI Division | Construction Trade / Line Item | Inspection Draw Stage | Line-Item Budget ($) | % of Rehab |
|---|---|---|---|---|
| Div 02 | Demolition, Hauling & Dumpsters | Draw Stage #1 | 4.1% | |
| Div 03 | Foundation, Concrete & Structural | Draw Stage #1 | 5.5% | |
| Div 06 | Rough Framing & Subfloor Carpentry | Draw Stage #1 | 6.8% | |
| Div 07 | Roofing, Fascia & Gutters | Draw Stage #2 | 8.6% | |
| Div 22 | Plumbing Rough-In, Re-Pipe & Water Heater | Draw Stage #2 | 5.9% | |
| Div 26 | Electrical 200A Panel & Re-Wire | Draw Stage #2 | 5.5% | |
| Div 23 | HVAC Condenser, Ductwork & Mini-Splits | Draw Stage #2 | 7.3% | |
| Div 09A | Insulation, Drywall & Interior/Exterior Paint | Draw Stage #3 | 8.2% | |
| Div 09B | LVP Flooring, Tile & Baseboards | Draw Stage #3 | 7.7% | |
| Div 12A | Kitchen Shaker Cabinets, Quartz & Appliances | Draw Stage #3 | 13.2% | |
| Div 12B | Bathrooms, Vanities, Tubs & Tile Surrounds | Draw Stage #3 | 8.6% | |
| Div 08 | Low-E Windows, Sliders & Entry Doors | Draw Stage #2 | 5.9% | |
| Div 32 | Stucco/Siding, Driveway & Landscaping | Draw Stage #4 | 4.5% | |
| Div 01A | Permits, Architecture & Engineering Plans | Draw Stage #1 | 2.3% | |
| Div 01B | 10% Hard-Cost Contingency Reserve | Draw Stage #4 | 5.9% |
LD-SHELF-RTL-BRIDGE (Non-Dutch Drawn-Balance) + LD-SHELF-PRIME-104 (90-Day ARV Takeout)
Lock Non-Dutch Rehab Financing + Waived-Exit-Fee DSCR Takeout
Submit your 15-trade SOW to Loan Daddy LLC (NMLS #2827624 · (480) 485-1229) for 85%–90% purchase + 100% rehab holdback on a Non-Dutch drawn-balance shelf.